Testing and Inspection on Diesel Tank

Completed
Testing and Inspection on Diesel Tank — project cover photo

Project Overview

Project / recent work: Testing and Inspection on Diesel Tank Source: PMS Engineering Business Profile 2026, page 15 Note from the profile: Method of Work: The tank and its fittings conform to BS 799: Part 5. The tank has been constructed using mild steel. The following fittings have been included: a 600 mm manhole, a dipstick calibrated in liters, a guide tube, and a striker plate. The quality of all welding joints has been verified through NDT methods (MPT & DPT). A hydrostatic test has been conducted to ensure the tank is leak-proof. To ensure corrosion protection, all blasting and painting activities have been performed in compliance with the requirements of ISO 12944. Testing and Inspection: MPT, DPT, Hydrostatic Test, Ultrasonic Thickness Gauging for shell thickness verification. According to approved Inspection & Test Plan (ITP).

Gallery

Testing and Inspection on Diesel Tank — project photo
Testing and Inspection on Diesel Tank — project photo
Testing and Inspection on Diesel Tank — project photo